An existing Client instructed TCL to inspect their period home in South West London and provide a detailed Defect Diagnosis Report on re-occurring damp issues impacting both first and second floors and a separate problem of excessive heat gain experienced during the warmer summer months. Using the findings of our report, the Client was then able to engage suitable contractors to implement the required remedial and improvement works to successfully address the identified issues.